Project Descriptions

For your review, we have provided Project Description information for many specific design/supply and EPC boiler upgrade projects. These Project Descriptions include biomass, chemical recovery, as well as MSW/RDF boiler combustion system, boiler overfire air system, and superheater upgrade projects. In these descriptions, the boiler and initial operating problem is described, along with the customer’s goals for upgrading the unit. The JANSEN scope of supply is described, as well as installation details. Key performance factors after the upgrade are also included.

Please feel free to print any of our Project Description sheets using Adobe Reader (which you can download at no cost to you). Alternatively, you can request that we send you a reprint of any Project Description sheet(s).

Biomass Boiler Overfire Air System Upgrades

  • DPB-24 – Foster Wheeler Power Boiler Combustion System Upgrade
    Daishowa-Marubeni, Peace River, Alberta
  • DPB-23 – No. 9 Power Boiler Overfire Air System Upgrade
    Harmac Pacific, Nanaimo, British Columbia
  • DPB-22 – Biomass Capacity Upgrade
    Minnesota Power-Hibbard Station, Duluth, Minnesota
  • DPB-21 – No. 11 Power Boiler OFA Delivery System Upgrade
    NewPage Corporation, Escanaba, Michigan
  • DPB-20 – No. 9 Power Boiler OFA Delivery System Upgrade
    SAPPI Fine Paper North America, Cloquet, Minnesota
  • DPB-19 – Combustion System Upgrade No. 3 Power Boiler
    Domtar Industries, Inc., Rothschild, Wisconsin
  • DPB-18 – Power Boiler Economizer Addition
    Domtar Papers, Kamloops, British Columbia, Canada
  • DPB-17 – Bubbling Fluidized Bed Secondary Air Delivery System Upgrade
    Catalyst Paper, Pt. Alberni, British Columbia, Canada
  • DPB-16 – Bark Boiler OFA Delivery System Upgrade
    NewPage Corporation, Wickliffe, Kentucky
  • DPB-15 – No. 1 Power Boiler OFA Delivery System Upgrade
    Large Paper Company, Location: North America (US South)
  • DPB-14 – No. 3 Power Boiler OFA Delivery System Upgrade
    Rayonier, Inc., Jesup, Georgia
  • DPB-13 – No. 2 Hog Fuel Boiler OFA Delivery System Upgrade
    SAPPI Fine Paper North America, Skowhegan, Maine
  • DPB-12 – Combination Boiler OFA Delivery System Upgrade
    Weyerhaeuser Corporation, Columbus, Mississippi
  • DPB-11 – No. 1 Hog Fuel Boiler OFA Delivery System Upgrade
    SAPPI Fine Paper North America, Skowhegan, Maine
  • DPB-10 – No. 8 Power Boiler Upgrade Overfire Air System
    Nippon Paper Group, Port Angeles, Washington
  • DPB-09 – No. 3 Power Boiler Overfire Air System Upgrade
    Large Paper Company, Location:  North America (US South)
  • DPB-08 – No. 2 Power Boiler Overfire Air System Upgrade
    Large Paper Company, Location: North America (US South)
  • DPB-07 – No. 6 Power Boiler Overfire Air System Upgrade
    Incineration of HVLC NCG
    Westvaco, Silsbee, Texas
  • DPB-06 – No. 3 Power Boiler Overfire Air System Upgrade
    Incineration of HVLC NCG
    Appleton Papers, Roaring Spring, Pennsylvania
  • DPB-05 – Bark and Sludge Boiler Overfire Air System
    Large Paper Company, Location: North America (US)
  • DPB-04 – No. 2 Hog Fuel Boiler Overfire Air System
    Willamette Industries, Inc., Campti, Louisiana
  • DPB-03 – No. 2 Wood Waste Power Boiler Overfire Air System
    Tolko Manitoba, Inc., The Pas, Manitoba, Canada
  • DPB-02 – No. 6 Bark Boiler Overfire Air System
    Mead Paper, Chillicothe, Ohio
  • DPB-01 – No. 2 Bark Boiler Overfire Air System
    Mead Coated Board Inc., Phoenix City, Alabama

Recovery Boiler Air System Upgrades

  • DRB-09 – Recovery Boiler Combustion Air System Upgrade & NOx Control
    Confidential Client
  • DRB-08 – Recovery Boiler Combustion Air System Upgrade & NOx Control
    Confidential Client
  • DRB-07 – Three-Level Air System Upgrade on CE Recovery Boiler
    Coated Paper and Hardwood Pulp Mill, USA (South)
  • DRB-06 – Three-Level Air System Upgrades on Two (2) Identical CE Recovery Boilers
    Containerboard Mill, USA (South)
  • DRB-05 – Multi-Level Air System Upgrade on CE Recovery Boiler
    Large Tissue Manufacturer, USA (South)
  • DRB-04 – Kraft B&W Recovery Boiler
    Large Tissue Manufacturer, USA (West)
  • DRB-03 – No. 1 Recovery Boiler Air System Upgrade
    Smurfit Mocarpel, San Felipe, Venezuela
  • DRB-02 – No. 4 Recovery Boiler Air System Upgrade
    Simpson Tacoma Kraft Company, Tacoma, Washington

Biomass Boiler Superheater Upgrades

  • PBSH-06 – Power Boiler Superheater Upgrade
    Simpson Tacoma Kraft, Tacoma, Washington
  • PBSH-05 – Power Boiler Superheater Upgrade
    Weyerhaeuser Company, Campti, Louisiana
  • PBSH-04 – Power Boiler Superheater Upgrade
    Confidential Customer, USA (Southeast)
  • PBSH-03 – Power Boiler Superheater Replacement
    Kimberly-Clark, Everett, Washington
  • PBSH-02 – Power Boiler Superheater Upgrade
    Confidential Customer, USA (New England)
  • PBSH-01 – Superheater Upgrade at Burnaby MSW Plant
    Montenay, Inc. Burnaby, British Columbia

Recovery Boiler Superheater Upgrades

  • RBSH-01 – Recovery Boiler Superheater Replacements
    Western Pulp Ltd., Port Alice, British Columbia

MSW/RDF Boiler Upgrades

  • DGB-05 – RDF Boiler Overfire Air System Upgrade CCRA, Hartford, Connecticut
  • DGB-04 – Combustion System Upgrades on RDF Boilers
     Wheelabrator Technologies, Inc. Portsmouth, Virginia
  • DGB-03 – RDF Boiler Overfire Air System Upgrade
     Great River Energy, Elk River, Minnesota
  • DGB-02 – Tacoma Public Utilities Fluidized Bed Combustor Upgrade
     Tacoma Public Utilities, Tacoma, Washington
  • DGB-01 – Superheater Upgrade at Burnaby MSW Plant
     Montenay, Inc. Burnaby, British Columbia